2011 in review

The WordPress.com stats helper monkeys prepared a 2011 annual report for this blog. Here’s an excerpt: A New York City subway train holds 1,200 people. This blog was viewed about 4,800 times in 2011. If it were a NYC subway train, it would take about 4 trips to carry that many people. Click here to…

A step back for two forward.

Just when I was about to feel good about getting steady work done on the Wa’apa, I get a reality check.  It’s really no surprise, of course, that it would be the miserable climate we’ve had around here lately.  Fifty degree mornings and steady rain for weeks makes for very poor epoxy curing air, which…

Progress on the Wa’apa

Work has slowed down in the holiday run-up and the weather has been miserable enough to keep me from fishing, creating the perfect space for a little boat-building.  Actually, quite a bit has been done since my first post concerning the start of construction, so I think a little slide-show is in order.  Bulkheads were…